SATURDAY, NOV. 13
M. Chu
S, Kruger
C. Sovinec
S. Plimpton
R. Dagazian
E. Held
R. Nebel
D. Schnack
T. Gianakon
A. Tarditi
8:30 am - 11:30 am
I. Presentation of APS Papers
- ALL
Good presentations!
11:30 am - 1:30 pm BREAK FOR LUNCH
1:30 PM - 2:30 PM
II.Discussion of other ongoing applications
- Rick N.
2-Fluid in RFPs:
2 -fluid effects generate background flows comparable to the flow in
the modes. The flow is sheared (no net momentum). Appears to be a
quasi-linear effect. Has found a suspicious 1/12 mode. Is it real or
is it memorex?
"We'll figure it out." - Carl S.
- Michael Kissick
Michael presented an interesting plot showing the limitations of NIMROD
woth flow. High flow and high S don't work. Some suggestions were
meade te Michael will make, like running with si_in_v=false, etc. We
all appreciate Michael's patience with us. We are committed to slving
this problem.
- Eric Held
Presented some plans for including his thesis collisionless closure for
the heat flux into NIMROD.
- Alfonso
DIII-D high-beta disruption. The straight-line grid has cured the
problem of the numerical mode with Pr=1000. With Pr=10 the bad mode
returns even at beta_n=5. We may not have
the "cure" yet.
2:30 PM - 5:00 PM
II. Development
- AZTEC (Steve P.)
Good news: Fully implementd in the code.
Bad news: Can't compete with the present
line preconditioners.
- Higher order elements (Carl)
Status:
- Nimset complete
- Nimplot complete
- Nimrod partially functional. Still needs
- Degenerate point
- Regularity conditions
- Parallel seaming
- Extrapolation routines
- Preconditioner development
- CFL condition
- Use of higher order definitions in diagnostics
- Functional form of rz
- Optimization
- Quad. basis definitions exist for orders
1 and 2
- Polynomial orders > 1 not implemented for
tblocks
Initial tests show that biquadratic representation is much more
accurate for slab tearing mode. Need degenerate point capability to do
more realistic cases (like a tearing mode
in a cylinder).
- Reset capability (Tom)
Exists in Nimset. Tom has found a clever way to search a grid to
answer the question "What cell is a point (r,z) in?". Will allow
complete re-gridding and/or resetting the
polynomial order.
- Kinetic closures/particles (Scott P.)
Scott and his graduate student have made progress in the mechanics of
pushing particles in the Nimrod fields.
- Computations on tblocks (Alfonso)
Can't tell from the results presented.
- Pre-processing and web site issues (Scott
K.)
Changes to Fluxgrid and the web page were
described.
SUNDAY, NOVEMBER 14
8:30 am - 9:30 am
III. Other technical Issues
- Xdraw (new versions)
Scott presented Nina's results. She has done
an excellent job.
9:30 am - 11:00 am
IV. Develop plans and goals for next 3 months
As a reminder, here are the goals that we set last June. Please be
prepared to report on their status.
MILESTONES
GOAL RESP. PERSON DATE COMMENTS
(11/99)
Res. wall BC. implemented Tom. G 06/00 Changed from
Scott K.
Lin. high-beta disr. pyhsics Alfonso 04/00 linear
by Sherwood
Linear vac. validated w/GA Scott K. 04/99 Ming to
get case to SK for Sherwood
Nonlinear vac. implemented Scott K. 04/00
Push particles in NIMROD fields Scott P. 04/00 drift orbits
calculated
AZTEC version Steve P. 9/99
Complete
AZTEC into current ver. Steve P. 04/00
OO/C++ structure Ahmet 11/99
???
"Sig. progress" on high order eles. Carl S. 11/99
Complete
"Fully functional" high ord. eles. Carl S.
04/99
Neo-class. paper submitted Tom G. 12/99
Begin ST studies (hel. inj.) Carl S. 11/99
Complete
2-fluid multi-hel. RFP Rick N. 04/00
Numerical problems
Compete SSPX case Alfonso 04/00
Problems w/triangles
Flow and high-S in ET J.-N. 04/00
High-S works well, flows don't
Demo. of nonlinear high-S Dalton 04/00
Formulate diamag. corrections Chris H./Jim
C. 04/00
11:00 am - 11:45 am
V. Discussion of renewed "SSI" effort
11:45 am - 12:00 noon
VI. Date and location of next team meeting
Santa Fe, end of Jan. or beginning of Feb. Rick and Carl to
investigate.
VII. Adjourn